Shape
Converge with the PM on what the problem actually is before the EM goes solo on how to solve it. Plans fuse a PM-owned PRD half (the problem, what "solved" means) with an EM-owned SDD half (architecture, fix-locus, sequencing); the pipeline has rigor for the SDD half and almost none for the PRD half. /shape is that missing front-half: a short, collaborative problem-convergence beat whose only exit is a ratified problem-set that chains into coordinator:plan.
**/shape is a
[Description truncada. Veja o README completo no GitHub.]