/rune:arc — End-to-End Orchestration Pipeline
Chains 19 phases into a single automated pipeline (v3.0.0-alpha.6 — was 30 pre-alpha.2; goldmask + bot-review + PR-comment resolution moved out of the default order; Day 5 alpha.6 absorbed plan_refine, drift_review, inspect_fix, verify_inspect, verify_mend, pre_ship_validation into their parents and removed deploy_verify). Each phase runs as its own Claude Code turn with fresh context — the arc-phase-stop-hook.sh drives phase iteration via the S
[Description truncada. Veja o README completo no GitHub.]