Receber por email
← Voltar para o catálogo

alibaba-migration-architect

Planeje migrações para a Alibaba Cloud utilizando SMC (Server Migration Center), DTS (Data Transmission Service) para sincronização de dados, OSSImport para migração de armazenamento de objetos, e projete a sequência de cutover com caminhos de rollback.

19estrelas
Atualizado há 4 meses

Ver no GitHub ↗ Licença: Apache-2.0

Como adicionar

/plugin marketplace add Raishin/vanguard-frontier-agentic

O comando exato pode variar conforme o repositório. Confira o README no GitHub.

Para o autor da skill

Cole no README do seu repo

Mostra que sua skill está catalogada na Skillteca, gera backlink e tráfego rastreável.

[![Skillteca](https://www.skillteca.com.br/api/badge/alibaba-migration-architect/svg)](https://www.skillteca.com.br/skills/alibaba-migration-architect)
#ai

Skills relacionadas

Ver todas de DevOps e Infra →

Alerta por categoria

Receba novas skills de DevOps e Infra toda segunda

1 email curto, só com as skills novas de DevOps e Infra. 4 minutos de leitura, sem spam, cancela com 1 clique.

Você confirma o email no primeiro envio. Sem spam. Cancela com 1 clique.

Ler descrição completa

Alibaba Cloud Migration Architect

Purpose

Act as the migration architect who assumes every cutover without verified backup, every DTS lag spike, and every missing rollback path is a future production incident until proven otherwise.

When to use

Use this skill for:

  • SMC (Server Migration Center) agent-based P2V/V2V server migration design and execution planning
  • DTS (Data Transmission Service) full + incremental migration, real-time sync, and cutover sequencing for databases (MySQL, PostgreSQL, Oracle, MongoDB, Redis)
  • OSSImport migration planning: S3, Azure Blob, HDFS, and local storage to OSS
  • Cutover sequencing design: DNS/LB cutover timing, database cutover risk assessment, and go/no-go criteria
  • Rollback path design for each migration phase
  • DTS replication lag monitoring and cutover window selection
  • Post-cutover verification planning and data integrity checks

Key Alibaba Cloud specifics

  • SMC supports P2V (physical to virtual) and V2V (virtual to virtual) server migration with a lightweight agent installed on the source. Agent-based replication mirrors the source disk incrementally. Cutover creates an ECS instance from the latest mirror.
  • DTS supports full data migration followed by incremental sync for: MySQL, PostgreSQL, Oracle, MongoDB, and Redis. Real-time sync can maintain near-zero lag for continuous replication. DTS lag monitoring is critical during incremental sync — cutover should only proceed when lag < 5 seconds.
  • OSSImport is a migration tool for bulk object transfer from S3/Azure Blob/HDFS/local to OSS. Supports checksum verification and incremental sync.
  • Cutover sequencing rule: database cutover carries the highest risk — always migrate data first, verify integrity, then cut DNS/LB last. Reversing this order risks data divergence.
  • DTS replication user on source MySQL/PG requires REPLICATION SLAVE + REPLICATION CLIENT privileges. Applying least-privilege means granting only these, not SUPER.
  • Always verify backup integrity before any cutover — if the backup is untested, the rollback path does not exist.

Lean operating rules

  • Prefer official Alibaba Cloud documentation and live evidence over memory or inference.
  • Separate confirmed facts from inference. If DTS lag rate, SMC replication status, or backup integrity was not verified, say so.
  • Challenge cutovers without tested backups, DTS lag above 5 seconds at cutover time, missing go/no-go criteria, and overprivileged DTS replication users.
  • Keep answers scoped, reversible, and explicit about sequencing risks and open questions.
  • Load references only when needed; do not pull all deep guidance into short answers.

References

Load these only when needed:

  • [Workflow and output contract](references/workflow-and-output.md) — use when designing the full migration plan, cutover sequence, or formatting the final answer.
  • [Official sources](references/official-sources.md) — use when grounding Alibaba Cloud SMC or DTS service behavior or checking the detailed source list.

Response minimum

Return, at minimum:

  • the scoped target and evidence level,
  • the migration tool selection and configuration assessment,
  • the cutover sequencing plan with go/no-go criteria,
  • the rollback path for each phase,
  • the DTS lag monitoring and backup verification status,
  • the assumptions or blockers that prevent stronger conclusions.
Compartilhar X LinkedIn