Receber por email
← Voltar para o catálogo

capacity-planner

Para líderes de operações (ex: Diretor de CX, VP de Operações) que precisam dimensionar capacidade, construir planos de pessoal ou planejar suporte, esta skill oferece matemática de filas Erlang-C, dimensionamento de demanda P90, FTE ajustado por absenteísmo, limites de gatilho de gerente e planos de contratação trimestrais.

18.6kestrelas
Atualizado há 4 meses

Ver no GitHub ↗ Licença: MIT

Como adicionar

/plugin marketplace add alirezarezvani/claude-skills

O comando exato pode variar conforme o repositório. Confira o README no GitHub.

Para o autor da skill

Cole no README do seu repo

Mostra que sua skill está catalogada na Skillteca, gera backlink e tráfego rastreável.

[![Skillteca](https://www.skillteca.com.br/api/badge/capacity-planner/svg)](https://www.skillteca.com.br/skills/capacity-planner)
#ai

Alerta por categoria

Receba novas skills de Design e Frontend toda segunda

1 email curto, só com as skills novas de Design e Frontend. 4 minutos de leitura, sem spam, cancela com 1 clique.

Você confirma o email no primeiro envio. Sem spam. Cancela com 1 clique.

Ler descrição completa

capacity-planner

Sizing tool for ops teams that handle queued work — Support, CX, Customer Success, BizOps, IT ops, Finance ops. Built on Erlang-C queueing theory, Little's Law, and the operational-leadership canon (Fournier, Larson, Cleveland, Reinertsen). Deterministic, stdlib-only, no LLM calls.

Purpose

You are an ops leader sized 15 → 35 with no idea how the 35-person org will actually behave at peak load. Or you are at 88% utilization and SLA is starting to slip. Or you have a hiring budget approved and need to sequence it across four quarters without burning out the existing team. This skill answers those questions with arithmetic, not vibes.

It produces three artifacts:

  1. Capacity sizing at 70/80/90% utilization against P50/P90/P99

demand, with P(SLA breach) at each point and a SAFE/WATCH/AT_RISK/CRITICAL risk band.

  1. Utilization health at the per-member traffic-light level plus a

team verdict (HEALTHY/SQUEEZED/OVERLOADED/UNBALANCED).

  1. 12-month quarterly hiring plan accounting for ramp curves,

attrition, QoQ demand growth, and span-of-control manager triggers.

When to use

  • Annual ops capacity planning (October-November for the following

fiscal year).

  • Quarterly re-sizing if demand changed >15% or attrition spiked.
  • Pre-budget defense — the math that justifies the headcount ask

to your CFO.

  • Diagnostic when an ops team is missing SLA and you need to know

whether it's a sizing problem, a process problem, or a bottleneck problem.

  • M&A / new-segment launch modeling — sizing a new team or

combined org.

Workflow

  1. Intake demand. Pull P50/P90/P99 daily ticket/case volume from

your work system (Zendesk, Intercom, JSM, ServiceNow, Salesforce). If you only have averages, stop and pull the distribution. Single- point demand estimates are the most expensive anti-pattern in ops.

  1. Model throughput. Run capacity_modeler.py with your demand,

AHT, SLA target, current FTE, and shrinkage. Use --profile for your function (support / cx / bizops / finance-ops / it-ops). Read the 80%-utilization row — that's your sizing point.

  1. Flag utilization risk. Run utilization_analyzer.py against

your current team's actual utilization data. Anyone >85% sustained is a throughput-collapse risk per Reinertsen. Spread >30 percentage points across team means UNBALANCED — fix that before hiring.

  1. Sequence hiring. Run hiring_sequencer.py with current FTE,

target EOY, ramp time, attrition, and growth. It will front-load hires (Q1 35%, Q4 15%), apply ramp curves, and trigger a manager hire when span of control crosses 7 ICs/manager.

  1. Walk the Forcing-question library (see below). One question at

a time. Do not skip ahead. Answers must be written down before you commit the plan.

Scripts

  • scripts/capacity_modeler.py — Erlang-C sizing with shrinkage

adjustment and P50/P90/P99 breach probabilities. --profile for industry defaults.

  • scripts/utilization_analyzer.py — per-member traffic-light +

team-level health verdict with variance detection.

  • scripts/hiring_sequencer.py — 12-month quarterly plan with ramp,

attrition, growth, max-hires-per-quarter constraint, and manager-trigger logic.

All three accept --input <path> (JSON), --output {markdown,json}, --sample (built-in example), and --help. Stdlib only.

References

  • references/queueing_theory_canon.md — Erlang, Little, Hopp &

Spearman, Reinertsen, Kingman, Cleveland, ITIL, Armony et al. (8 sources). The math.

  • references/ops_workforce_planning_canon.md — Fournier, Larson,

Google SRE Workbook, Frei, Lawler, Bersin, Gartner, Grove (8 sources). The people factors.

  • references/capacity_anti_patterns.md — 11 named anti-patterns

with cited sources, tool guards, and the meta-discipline that Lencioni + Goldratt + Christensen impose. (8+ named sources.)

Assets

  • assets/capacity_brief_template.md — 20-minute fill-out template

with JSON skeletons for all three tools and an output checklist.

Assumptions

This skill assumes:

  • Work is queued (tickets, cases, work items) — not project-style.

If your team's work isn't queued, this is the wrong skill.

  • Demand has a stationary-enough distribution within a quarter.

Step-changes (new product launch, M&A, regulatory shift) require re-running mid-quarter.

  • You have at least 90 days of historical demand data to compute

P50/P90/P99. If not, generate the distribution from your sales / user-base forecast first.

  • Service is single-class within a queue. If you have hard

priority tiers (P1/P2/P3 with class-specific SLAs), model each as a separate queue and sum.

  • Channels are modeled coherently. Multi-channel teams use the

appropriate --profile with built-in shrinkage premium.

Anti-patterns

See references/capacity_anti_patterns.md for the full taxonomy with sources. Top eight:

  1. Plan-to-100%-utilization (Reinertsen Principle 12)
  2. Treat-ramp-as-instant (Larson)
  3. Ignore-attrition-in-12-month-plan (Bersin)
  4. Hire-ICs-forever-with-no-manager-trigger (Fournier)
  5. Size-to-P50-demand-only (Cleveland)
  6. No-shrinkage-adjustment (Cleveland, SRE Workbook)
  7. Single-channel-model-for-multi-channel-work (Gartner, Kingman)
  8. No-surge-plan-for-P99-events (Hopp & Spearman, Reinertsen)

Distinct from

  • c-level-advisor/vpe-advisor measures engineering throughput

via DORA 4 metrics, story points, deployment frequency, and cycle time bottlenecks. It is for engineering teams shipping code. This skill is for ops teams handling tickets/cases. Different unit of work, different math (Erlang-C vs. DORA), different bottleneck (queueing-blind staffing vs. WIP + lead time).

  • c-level-advisor/chro-advisor does strategic workforce

planning (1-5 year capability portfolios, talent supply, leadership succession). This skill does operational 0-12 month capacity sizing against demand. Per Lawler: conflating them gets you hired into the wrong jobs.

  • **project-management/*** tracks delivery throughput on projects

(Jira velocity, sprint capacity). This skill sizes around steady- state queued work.

  • Sibling process-mapper finds the bottleneck. This skill

sizes the team around a known bottleneck. Order of operations: process-mapper first → capacity-planner second. Hiring around the wrong constraint wastes the hires.

  • business-growth/cs-coverage (if it exists) sizes Customer

Success coverage by ARR/CSM ratio and segment. This skill sizes by queued work volume (tickets, cases, escalations). For a CS team that handles both relationship work AND a ticket queue, run both.

Forcing-question library (Matt Pocock grill discipline)

Discipline: walk these one at a time. Do not skip ahead. Answers must be written down. If you can't answer one, that is your next investigation.

Q1 — "What is your bottleneck, and have you confirmed it empirically?"

Recommended answer: a named, measured stage in the workflow with queue-time data showing where work waits. Not a vibe. Not "escalations take too long". An actual measured queue.

Why it's the first question: Goldratt (The Goal, 1984) — every system has exactly one binding constraint at a time. Sizing around the wrong constraint wastes hires entirely. If you do not know your bottleneck, run process-mapper BEFORE this skill.

Canon: Eli Goldratt, The Goal (1984); Reinertsen, Principles of Product Development Flow (2009).

Q2 — "What service trade-off are you accepting?"

Recommended answer: a written, explicit choice — fast vs. empathetic, broad vs. deep, low-cost vs. high-quality. Frances Frei is unambiguous: you cannot win all four. The team that tries wins zero.

Why it matters: AHT, SLA, and shrinkage inputs are the operational expression of this trade-off. If they don't agree (e.g., you set AHT for "empathy" b

Compartilhar X LinkedIn