Receber por email
← Voltar para o catálogo

cm-safe-deploy

Use when setting up deployment infrastructure or enforcing a gated release path. Routes to deploy gates, setup, or rollback based on the current deployment stage.

46estrelas
Atualizado há 4 meses

Ver no GitHub ↗

Como adicionar

/plugin marketplace add tody-agent/codymaster

O comando exato pode variar conforme o repositório. Confira o README no GitHub.

Para o autor da skill

Cole no README do seu repo

Mostra que sua skill está catalogada na Skillteca, gera backlink e tráfego rastreável.

[![Skillteca](https://www.skillteca.com.br/api/badge/cm-safe-deploy-mpsuwuum/svg)](https://www.skillteca.com.br/skills/cm-safe-deploy-mpsuwuum)

Skills relacionadas

Ver todas de DevOps e Infra →

Alerta por categoria

Receba novas skills de DevOps e Infra toda segunda

1 email curto, só com as skills novas de DevOps e Infra. 4 minutos de leitura, sem spam, cancela com 1 clique.

Você confirma o email no primeiro envio. Sem spam. Cancela com 1 clique.

Ler descrição completa

Safe Deploy Pipeline v2

TL;DR

  • Use before/during staging or production deployment
  • Model: gated deploy pipeline with hard stops
  • Decision: choose setup, active gate execution, or rollback
  • Next: cm-quality-gate for verification evidence

The Iron Law

NO DEPLOY WITHOUT PASSING ALL GATES.
GATES ARE SEQUENTIAL.
IF A GATE FAILS, FIX FIRST.

When to Use

  • Establishing deploy infrastructure for a new project
  • Hardening an existing project that deploys without gates
  • Recovering after incidents caused by weak release validation
  • Running or reviewing a release pipeline before production changes

Choose Your Path

Need to create deploy infrastructure for a project?
└─ YES → Setup path

Already have infrastructure and need to run or review gates?
└─ YES → Gate path

Did a deploy fail or need reversal?
└─ YES → Rollback path

| Path | Summary | Load | |---|---|---| | Setup | Establish scripts, tests, and deploy workflow | references/setup-new-project.md | | Gate 0 | Secret hygiene | references/gate-0-secret-hygiene.md | | Gate 0.5 | Security scanning | references/gate-0-5-security-scan.md | | Gate 1 | Syntax validation | references/gate-1-syntax.md | | Gate 2 | Test suite | references/gate-2-test-suite.md | | Gate 3 | i18n parity | references/gate-3-i18n.md | | Gates 4-5 | Build + dist verification | references/gate-4-5-build-dist.md | | Gate 6 | Deploy + smoke verification | references/gate-6-deploy-smoke.md | | Rollback | Recovery and reversal | references/rollback.md |

Gate Map

0   Secret hygiene
0.5 Security scan
1   Syntax
2   Test suite
3   i18n parity
4   Build verification
5   Dist verification
6   Deploy + smoke test

Load Rules

  • Load only the gate reference for the current stage.
  • Load setup-new-project.md only when establishing infrastructure.
  • Load rollback.md only when deployment fails or rollback planning is required.

Integration

| Skill | Why | |---|---| | cm-quality-gate | verification and evidence checks | | cm-identity-guard | deploy identity verification | | cm-safe-i18n | i18n-specific gate setup | | cm-terminal | monitored execution of gate commands |

Rules

  • Gates are sequential and blocking.
  • Do not skip to later gates when an earlier gate fails.
  • Keep deploy setup and active deploy execution separate in your head and in your prompts.
  • Security and secret hygiene remain part of this skill; do not rely on deprecated skills.

The Bottom Line

Choose setup, the current gate, or rollback. Load only that path, and stop on failure.

Compartilhar X LinkedIn