Receber por email
← Voltar para o catálogo

executing-plans

Use when you have a written implementation plan to execute in a separate session with review checkpoints

26estrelas
Atualizado há 2 meses

Ver no GitHub ↗ Licença: MIT

Como adicionar

/plugin marketplace add DollarDill/beads-superpowers

O comando exato pode variar conforme o repositório. Confira o README no GitHub.

Para o autor da skill

Cole no README do seu repo

Mostra que sua skill está catalogada na Skillteca, gera backlink e tráfego rastreável.

[![Skillteca](https://www.skillteca.com.br/api/badge/executing-plans-dollardill/svg)](https://www.skillteca.com.br/skills/executing-plans-dollardill)

Skills relacionadas

Ver todas de Desenvolvimento →

Alerta por categoria

Receba novas skills de Desenvolvimento toda segunda

1 email curto, só com as skills novas de Desenvolvimento. 4 minutos de leitura, sem spam, cancela com 1 clique.

Você confirma o email no primeiro envio. Sem spam. Cancela com 1 clique.

Ler descrição completa

Executing Plans

Overview

Load plan, review critically, execute all tasks, report when complete.

Announce at start: "I'm using the executing-plans skill to implement this plan."

Note: Tell your human partner that this system works much better with access to subagents (Claude Code, Codex, Copilot CLI, and Gemini CLI all qualify). If subagents are available, use beads-superpowers:subagent-driven-development instead of this skill.

The Process

Step 1: Load and Review Plan

  1. Ensure an isolated workspace first — use the beads-superpowers:using-git-worktrees skill.
  2. Read plan file
  3. Review critically - identify any questions or concerns about the plan
  4. If concerns: Raise them with your human partner before starting
  5. If no concerns: Create epic bead and child beads for each task, then proceed

Create the epic, then import the child tasks as JSONL:

```bash # 1. Create the epic (→ note its id): bd create "Epic: <plan-name>" -t epic -p 2 -d "<goal>

Success Criteria

  • <measurable outcome from the plan's Goal>"

# 2. Author the tasks as JSONL — one issue per line, id OMITTED (auto-assigned; # a supplied colliding id would overwrite that bead and reset its omitted fields). # Parent each to the epic; embed the bd lint-required '## Acceptance Criteria' in # 'description' (or the 'acceptance_criteria' field). Read bd import --help on # first use; bd export <id> round-trips a real bead as a schema template. cat <<'EOF' | bd import - {"title":"Task 1: <title>","issue_type":"task","priority":2,"description":"<summary>\n\n## Acceptance Criteria\n- <outcome>","dependencies":[{"depends_on_id":"<epic-id>","type":"parent-child"}]} {"title":"Task 2: <title>","issue_type":"task","priority":2,"description":"<summary>\n\n## Acceptance Criteria\n- <outcome>","dependencies":[{"depends_on_id":"<epic-id>","type":"parent-child"}]} EOF ```

Confirm the import output shows no Skipped dependency (a dep to a missing target is skipped, not rolled back). bd lint requires ## Success Criteria in the epic's description and ## Acceptance Criteria in each task's — embed them as above.

> Wire task ordering (blocks) after the import. parent-child rides the import, but inter-task blocks deps do not (children's ids are auto-assigned, so siblings can't reference each other in one file). Capture the ids scoped to the parent (a title grep collides with old beads), then wire ordering atomically: > ``bash > bd ready --parent <epic-id> --json # → the child task ids > printf 'dep add <task-2-id> <task-1-id> blocks\n' | bd batch > ` > Note: bd batch create does not support --description/--parent/--acceptance — that is why task creation uses bd import, not bd batch`.

Step 2: Execute Tasks

For each task:

  1. Get and claim the next task in one call: bd ready --parent <epic-id> --claim (use bd ready --explain to see dependency reasoning if task ordering is unclear)
  2. Check description quality before implementing: if the claimed task's description is a bare title with no actionable steps or context, STOP — do not proceed with implementation. The task is now claimed: flag it for human decision (bd label add <task-id> human, per Structured blocker handling below) so it doesn't dangle in-progress, and surface to the user what the description is missing.
  3. Follow each step exactly (plan has bite-sized steps), using the beads-superpowers:test-driven-development skill for the implementation — RED-GREEN-REFACTOR
  4. Run verifications as specified
  5. Close the task: bd close <task-id> --reason "description of what was completed"
  6. Check epic progress: bd epic status <epic-id> to see overall completion
--claim consent boundary. This skill's autonomous take-next / batch-dispatch flow is the one place bd ready --claim is legitimate. That autonomous --claim is FORBIDDEN wherever the user picks the work (orientation, brainstorming, session close) — the consent gate binds even when this skill is not loaded.

Step 3: Complete Development

After all tasks complete and verified:

  • Announce: "I'm using the finishing-a-development-branch skill to complete this work."
  • REQUIRED SUB-SKILL: Use beads-superpowers:finishing-a-development-branch
  • The finishing skill includes the Land the Plane session close protocol (bd close → bd dolt push → git push → git status)
  • Follow that skill to verify tests, present options, execute choice

When to Stop and Ask for Help

STOP executing immediately when:

  • Hit a blocker (missing dependency, test fails, instruction unclear)
  • Plan has critical gaps preventing starting
  • You don't understand an instruction
  • Verification fails repeatedly

Structured blocker handling: When you hit a blocker, classify it and use the appropriate response:

| Blocker type | Action | Command | |---|---|---| | Time-based (waiting on deploy, external process) | Defer the task for later | bd defer <task-id> --until="<date>" | | Missing work (prerequisite not built yet) | Create the missing task and wire dependency | bd create "Missing: <title>" -t task --parent <epic-id> then bd dep add <blocked-id> <new-id> | | Human decision needed (architecture choice, ambiguous requirement) | Flag for human input | bd label add <task-id> human |

Discovered-work bead stamp: bd create "[spec] <title>" -t task --parent <epic-id> --notes "Severity:/Confidence:/Evidence:" — see verification-before-completion → Agent-Filed Bead Discipline.

Ask for clarification rather than guessing.

When to Revisit Earlier Steps

Return to Review (Step 1) when:

  • Partner updates the plan based on your feedback
  • Fundamental approach needs rethinking

Don't force through blockers - stop and ask.

Remember

  • Review plan critically first
  • Follow plan steps exactly
  • Don't skip verifications
  • Reference skills when plan says to
  • Stop when blocked, don't guess
  • Never start implementation on main/master branch without explicit user consent
  • Production-Grade Doctrine: never skip a verification or drop a task to make progress — bd defer/bd human are for genuine blockers, never a quiet way to descope required work. Never weaken, bypass, or remove a security control — a security regression is never acceptable.

Capture what you learned. At close, record durable, evidence-backed insights (still true next month, tied to a file, test, or command). Never record guesses, one-offs, or secrets (tokens, keys, PII — every memory is injected into all future sessions). Update in place (bd remember --key <key>) rather than adding a near-duplicate.

bd remember "<kind>: <durable, evidence-backed insight>"   # kind: lesson / pattern / design / root-cause / research
Compartilhar X LinkedIn