Paths: File paths (
references/,../ln-*) are relative to this skill directory.
Automated Test Planner
Type: L3 Worker
Creates Story test task with comprehensive automated test coverage (E2E/Integration/Unit) based on Risk-Based Testing methodology and REAL manual testing results.
Inputs
| Input | Required | Source | Description |
|---|---|---|---|
storyId | Yes | args, git branch, kanban, user | Story to process |
Resolution: Story Resolution Chain. Status filter: To Review
Purpose & Scope
- Create comprehensive test task for Story automation
- Calculate risk-based priorities (Impact x Probability)
- Generate 11-section test plan from manual test results
- Delegate to ln-301-task-creator (CREATE) or ln-302-task-replanner (REPLAN)
- NOT for: manual testing, research, or orchestration
When to Use
- Use when implementation work is done and automated test coverage must be planned
- All implementation Tasks in Story status = Done
- ln-521 research: uses if available, generates minimal inline research if missing
- ln-522 manual testing: uses if available, marks as 'skipped by policy' if missing
Automation: Supports autoApprove: true in managed runs to skip manual confirmation.
Workflow
Phase 0: Tools Config
MANDATORY READ: Load references/environment_state_contract.md, references/storage_mode_detection.md, and references/input_resolution_pattern.md
Extract: task_provider = Task Management → Provider (linear | file).
Phase 1: Discovery (Automated)
- Resolve storyId: Run Story Resolution Chain per guide (status filter: [To Review]).
- Auto-discover Team ID from
docs/tasks/kanban_board.md(see CLAUDE.md "Configuration Auto-Discovery")
Phase 2: Story + Tasks Analysis (NO Dialog)
Step 0: Study Project Test Files
- Scan for test-related files:
- tests/README.md (commands, setup, environment)
- Test configs (jest.config.js, vitest.config.ts, pytest.ini)
- Existing test structure (tests/, tests/ directories)
- Coverage config (.coveragerc, coverage.json)
- Extract: test commands, framework, patterns, coverage thresholds
- Ensures test planning aligns with project practices
Step 1: Load Research and Manual Test Results
- Fetch Story (must have label "user-story"):
- IF
task_provider=linear:get_issue(storyId)— extract Story.id (UUID, NOT short ID) - IF
task_provider=file:Read story.md— extract Story metadata
- IF
- Load research comment (from ln-521): "## Test Research: {Feature}"
- IF
task_provider=linear:list_comments(issueId=storyId)→ find matching comment - IF
task_provider=file:Glob("docs/tasks/epics/*/stories/*/comments/*.md")→ find matching comment - IF research comment not found: generate 3-5 bullet points of key test areas based on Story AC and task descriptions (inline, no external research).
- IF
- Load manual test results comment (from ln-522): "## Manual Testing Results"
- Same approach as research comment above
- IF manual test results not found: skip manual test coverage analysis. Note in output: 'Manual testing: skipped by policy (simplified mode).'
- Parse sections: AC results (PASS/FAIL), Edge Cases, Error Handling, Integration flows
- Map to test design: PASSED AC -> E2E, Edge cases -> Unit, Errors -> Error handling, Flows -> Integration
Step 2: Analyze Story + Tasks
- Parse Story: Goal, Test Strategy, Technical Notes
- Fetch all child Tasks (status = Done):
- IF
task_provider=linear:list_issues(parentId=Story.id, state="Done") - IF
task_provider=file:Glob("docs/tasks/epics/*/stories/*/tasks/*.md")→ filter by**Status:** Done
- IF
- Analyze each Task:
- Components implemented
- Business logic added
- Integration points created
- Conditional branches (if/else/switch)
- Identify what needs testing
Phase 3: Parsing Strategy for Manual Test Results
Process: Locate Linear comment with "Manual Testing Results" header -> Verify Format Version 1.0 -> Extract structured sections (Acceptance Criteria, Test Results by AC, Edge Cases, Error Handling, Integration Testing) using regex -> Validate (at least 1 PASSED AC, AC count matches Story, completeness check) -> Map parsed data to test design structure
Error Handling: Missing comment -> use fallback (inline research or skip per Phase 2 logic), Missing format version -> WARNING (try legacy parsing), Required section missing -> use fallback, No PASSED AC -> ERROR (fix implementation)
Phase 4: Risk-Based Test Planning (Automated)
MANDATORY READ: Load references/risk_based_testing_guide.md for scoring and usefulness gates.
Conditional read: load references/risk_based_testing_methodology.md only when planning a full test strategy or when the risk/usefulness decision is ambiguous.
E2E-First Approach: Prioritize by business risk (Priority = Impact x Probability), not coverage metrics.
Workflow:
Step 1: Risk Assessment
Calculate Priority for each scenario from manual testing:
Priority = Business Impact (1-5) x Probability (1-5)
Decision Criteria:
- Priority ≥15 -> MUST test
- Priority 9-14 -> SHOULD test if not covered
- Priority <=8 -> SKIP (manual testing sufficient)
Step 2: E2E Test Selection (2-5): Baseline 2 (positive + negative) ALWAYS + 0-3 additional (Priority ≥15 only)
Step 3: Unit Test Selection (0-15): DEFAULT 0. Add ONLY for complex business logic (Priority ≥15): financial, security, algorithms
Step 4: Integration Test Selection: DEFAULT 0. Add ONLY if E2E gaps AND Priority ≥15: rollback, concurrency, external API errors
Step 5: Validation: Each test passes Usefulness Criteria (Priority ≥15, Confidence ROI, Behavioral, Predictive, Specific, Non-Duplicative)
Phase 5: Test Task Generation (Automated)
Generates complete test task per test_task_template.md (11 sections):
Sections 1-7: Context, Risk Matrix, E2E/Integration/Unit Tests (with Priority scores + justifications), Coverage, DoD
Section 8: Existing Tests to Fix (analysis of affected tests from implementation tasks)
Section 9: Infrastructure Changes (packages, Docker, configs - based on test dependencies)
Section 10: Documentation Updates (README, CHANGELOG, tests/README, config docs)
Section 11: Legacy Code Cleanup (unsupported patterns, backward compat, dead code)
Shows preview for review.
Phase 6: Confirmation & Delegation
Step 1: Preview generated test plan (always displayed for transparency)
Step 2: Confirmation logic:
- autoApprove: true -> proceed automatically
- Manual run -> prompt user to type "confirm"
Step 3: Check for existing test task
- IF
task_provider=linear:list_issues(parentId=Story.id, label="tests") - IF
task_provider=file:Glob("docs/tasks/epics/*/stories/*/tasks/*.md")→ filter by**Labels:**containingtests
Decision:
- Count = 0 -> CREATE MODE (Step 4a)
- Count >= 1 -> REPLAN MODE (Step 4b)
Step 4a: CREATE MODE (if Count = 0)
Managed delegation sequence:
- Compute
childRunId = {parent_run_id}--ln-301--{storyId} - Compute
childSummaryArtifactPath = .hex-skills/runtime-artifacts/runs/{parent_run_id}/task-plan/ln-301--{storyId}.json - Materialize child manifest at
.hex-skills/test-planning/ln-301--{storyId}_manifest.json - Start
task-plan-worker-runtimewith both transport inputs - Checkpoint
child_runmetadata inPHASE_6_DELEGATE_TASK_PLAN - Invoke
ln-301-task-creatorwith--run-idand--summary-artifact-path - Read only the resulting child
task-planartifact
Pass to worker:
- taskType, teamId, storyData (Story.id, title, AC, Technical Notes, Context)
- researchFindings (from ln-521 comment)
- manualTestResults (from ln-522 comment)
- testPlan (e2eTests, integrationTests, unitTests, riskPriorityMatrix)
- infrastructureChanges, do