Receber por email
← Voltar para o catálogo

nw-execute

Dispatches a single roadmap step to a specialized agent for TDD execution. Use when implementing a specific step from a roadmap.json plan.

556estrelas
Atualizado há 4 meses

Ver no GitHub ↗ Licença: MIT

Como adicionar

/plugin marketplace add nWave-ai/nWave

O comando exato pode variar conforme o repositório. Confira o README no GitHub.

Para o autor da skill

Cole no README do seu repo

Mostra que sua skill está catalogada na Skillteca, gera backlink e tráfego rastreável.

[![Skillteca](https://www.skillteca.com.br/api/badge/nw-execute/svg)](https://www.skillteca.com.br/skills/nw-execute)
#ai

Alerta por categoria

Receba novas skills de Design e Frontend toda segunda

1 email curto, só com as skills novas de Design e Frontend. 4 minutos de leitura, sem spam, cancela com 1 clique.

Você confirma o email no primeiro envio. Sem spam. Cancela com 1 clique.

Ler descrição completa

NW-EXECUTE: Atomic Task Execution

Wave: EXECUTION_WAVE | Agent: Dispatched agent (specified by caller)

Overview

Dispatch a single roadmap step to an agent. Orchestrator extracts step context from roadmap so agent never loads the full roadmap.

Syntax

/nw-execute @{agent} "{feature-id}" "{step-id}"

Context Files Required

  • docs/feature/{feature-id}/deliver/roadmap.json — Orchestrator reads once, extracts step context
  • docs/feature/{feature-id}/deliver/execution-log.json — Agent appends only (never reads)

Rigor Profile Integration

Before dispatching the agent, read rigor config from .nwave/des-config.json (key: rigor). If absent, use standard defaults.

  • agent_model: Pass as model parameter to Agent tool. If "inherit", omit model (inherits from session).
  • tdd_phases: Modify the TDD_PHASES section in the DES template to match the configured phases. The 3-phase canon (ADR-025) is [RED, GREEN, COMMIT]; the lean variant is [RED, GREEN]. Legacy 5-phase contract ([PREPARE, RED_ACCEPTANCE, RED_UNIT, GREEN, COMMIT]) and its lean variant ([RED_UNIT, GREEN]) remain supported for audit-log replay of pre-2026-05-07 commits. Remove omitted phases' instructions from the template.
  • refactor_pass: If false, skip COMMIT phase refactoring instructions.

Dispatcher Workflow

  1. Parse Parameters — Extract agent name, feature ID, and step ID from invocation. Gate: all three parameters present and non-empty.
  2. Load Rigor Profile — Read .nwave/des-config.json key rigor (default: standard if absent). Gate: config loaded or default applied.
  3. Validate Context Files — Confirm docs/feature/{feature-id}/deliver/roadmap.json and execution-log.json exist. Gate: both files present; report path-not-found if missing.
  4. Extract Step Context — Grep roadmap for step_id: "{step-id}" with ~50 lines context. Gate: step found; report available step IDs if missing.
  5. Invoke Agent — Call Agent tool with DES template below, applying rigor model and phases from step 2. Gate: Agent tool called, not executed inline.

Agent Invocation

@{agent}

Use this DES template verbatim. Fill {placeholders} from roadmap. Without DES markers, hooks cannot validate.

<!-- DES-VALIDATION : required -->
<!-- DES-PROJECT-ID : {feature-id} -->
<!-- DES-STEP-ID : {step-id} -->

# DES_METADATA
Step: {step-id}
Feature: {feature-id}
Command: /nw-execute

# AGENT_IDENTITY
Agent: {agent-name}

# SKILL_LOADING
Before starting TDD phases, read your skill files for methodology guidance.
Skills path: ~/.claude/skills/nw-{skill-name}/SKILL.md
Always load before RED: tdd-methodology.md, quality-framework.md (3-phase canon, ADR-025) — legacy 5-phase logs reference loading at PREPARE.
Load on-demand per phase as specified in your Skill Loading Strategy table.

# TASK_CONTEXT
{step context from roadmap - name|criteria|test_file|scenario_name|implementation_notes|deps|files_to_modify (per nWave/templates/roadmap-schema.json)}

# DESIGN_CONTEXT
{Summary of architectural decisions relevant to this step, extracted by the orchestrator from docs/product/architecture/brief.md and wave-decisions.md. Include: component structure, dependency boundaries, technology choices, and any design constraints that affect implementation. If no design artifacts exist, write "No design artifacts available — use project conventions."}

# TDD_PHASES
3-phase canon (ADR-025, 2026-05-07). Execute in order:

1. RED - Activate the pre-authored acceptance test (PRIMARY TBU DEFENSE); write PBT unit tests ONLY if the AT cannot reach GREEN without them.
   AT activation: If TASK_CONTEXT includes test_file, locate it and remove the @skip/@ignore/@pending/xit/.skip/[Ignore] marker from the target scenario (the AT scaffold was authored by DISTILL — DELIVER does NOT re-author ATs). Run it — must fail for business logic reason (not import/syntax error). Fail-for-right-reason gate: collected ≥ 1, failures ≥ 1, no collection errors, semantic AssertionError / expected-exception-not-thrown.
   PORT-TO-PORT PRINCIPLE: The acceptance test exercises the scenario through
   the driving port (application service, orchestrator, CLI handler, API controller),
   not a decomposed helper or internal class. A correctly-written port-to-port test
   makes TBU structurally impossible — if a new function were missing or unwired,
   THIS test stays RED. That is the entire point: GREEN is unreachable without wiring.
   Litmus test: "If I delete the call-site that wires the new code, does this test fail?"
   If no → the test is at the wrong level. Stop and flag to orchestrator (DISTILL re-author needed).
   Conditional unit-test authoring: write PBT unit tests (or integration tests for adapter/infrastructure code — adapters use real infrastructure, never mocked unit tests) ONLY when the AT requires them to reach GREEN. If the AT can pass via direct minimal implementation, skip unit-test authoring inside RED.

2. GREEN - Minimal code to pass AT + any unit tests authored in RED.
   After GREEN: run FULL test suite. If all pass, proceed to COMMIT immediately.
   Smell test: if any new function is only called from test code, your acceptance
   test is at the wrong abstraction level — stop and flag.
   Never move to new task or stop without committing green code.

3. COMMIT - Stage and commit with conventional message.
   Include git trailer: `Step-ID: {step-id}` (required for DES verification)
   Example:
   ```
   feat(feature-id): implement feature X

   Step-ID: 02-01
   ```

LEGACY 5-PHASE CONTRACT (ADR-024 era, pre-2026-05-07): PREPARE → RED_ACCEPTANCE → RED_UNIT → GREEN → COMMIT. Preserved for audit-log replay only — new work uses the 3-phase canon above. Audit-log entries referencing RED_ACCEPTANCE/RED_UNIT/PREPARE represent merged sub-steps now folded into RED.

# QUALITY_GATES
- All tests pass before COMMIT
- No skipped phases without blocked_by reason
- Coverage maintained or improved

# OUTCOME_RECORDING
After ACTUALLY EXECUTING each phase, record via DES CLI:

    des-log-phase \
      --project-dir docs/feature/{feature-id}/deliver \
      --step-id {step-id} \
      --phase {PHASE_NAME} \
      --status EXECUTED \
      --data PASS

For SKIPPED phases (genuinely not applicable):

    des-log-phase \
      --project-dir docs/feature/{feature-id}/deliver \
      --step-id {step-id} \
      --phase {PHASE_NAME} \
      --status SKIPPED \
      --data "NOT_APPLICABLE: reason"

CLI enforces real UTC timestamps and validates phase names.
Do NOT manually edit execution-log.json.
Use the DES CLI to record phase outcomes and create log files.
Python resolution: `$(command -v python3 || command -v python)` — works on macOS (python3 only), Linux, and Windows.

CRITICAL: Only the executing agent calls the CLI.
Orchestrator MUST NEVER write phase entries — only the agent that performed the work. A log entry without actual execution is a **violation that DES detects and that will cause integrity verification to fail**, blocking finalize.

# RECORDING_INTEGRITY
Valid Skip Prefixes: NOT_APPLICABLE, BLOCKED_BY_DEPENDENCY, APPROVED_SKIP, CHECKPOINT_PENDING
Anti-Fraud Rules:
- NEVER write EXECUTED for phases you did not actually perform
- NEVER invent timestamps — DES CLI generates real UTC timestamps
- DES audits all entries; integrity violations block finalize

# BOUNDARY_RULES
- Only modify files listed in step's files_to_modify
- Do not load roadmap.json
- Do not modify execution-log.json structure (append only)
- NEVER write execution-log entries for phases you did not execute

# TIMEOUT_INSTRUCTION
Target: 30 turns max. If approaching limit, COMMIT current progress.
If GREEN complete (all tests pass), MUST commit before returning — even at turn limit.

Configuration:

  • subagent_type: extracted agent name
  • Turn limits are defined in each agent's maxTurns frontmatter field (not as a tool parameter)

Error Handling

  1. Invalid Agent — Report availa
Compartilhar X LinkedIn