Receber por email
← Voltar para o catálogo

validating

Use after planning and before execution to verify approved current work is reality-fit, feasibility-ready, and explicitly approved at Gate 3.

0estrelas
Atualizado há 5 meses

Ver no GitHub ↗

Como adicionar

/plugin marketplace add quanpersie2001/pulse

O comando exato pode variar conforme o repositório. Confira o README no GitHub.

Para o autor da skill

Cole no README do seu repo

Mostra que sua skill está catalogada na Skillteca, gera backlink e tráfego rastreável.

[![Skillteca](https://www.skillteca.com.br/api/badge/validating/svg)](https://www.skillteca.com.br/skills/validating)

Skills relacionadas

Ver todas de Documentos →

Alerta por categoria

Receba novas skills de Documentos toda segunda

1 email curto, só com as skills novas de Documentos. 4 minutos de leitura, sem spam, cancela com 1 clique.

Você confirma o email no primeiro envio. Sem spam. Cancela com 1 clique.

Ler descrição completa

Validating

If preflight readiness is missing, stale, or blocked (check .pulse/tooling-status.json), stop and invoke pulse:using-pulse.

Purpose

Do not start execution unless current work is feasibility-ready in real repo conditions. This skill verifies that:

  • mode and shape still fit current reality
  • assumptions are proven with concrete evidence
  • current-work artifacts are executable
  • beads are schema-valid and implementation-ready when needed
  • execution stays blocked until explicit user approval

Non-Negotiable Gates

  • Gate A — Approved shape is required in work-shape.md, phase-plan.md, or epic-map.md.
  • Gate B — Reality + feasibility must pass before structural polish.
  • Gate C — If beads exist, bead schema must pass before structural checker.
  • Gate D (Gate 3) — Explicit user approval is mandatory before execution.

If any gate fails, stop and route back; never “proceed anyway.”

Required Inputs

  • history/<feature>/CONTEXT.md
  • history/<feature>/discovery.md
  • history/<feature>/approach.md
  • approved shape artifact: work-shape.md, phase-plan.md, or epic-map.md
  • mode-required current-work artifacts:
  • direct/spike/small: current work in work-shape.md
  • epic-map: current-story-pack.md
  • phase-plan: phase-<n>-contract.md and phase-<n>-story-map.md
  • .beads/*.md for current work only when beads already exist

If any required non-bead artifact is missing, return to pulse:planning.

Runtime Flow (Hot Path)

0) Orient to mode, shape, and current work (mandatory every run)

Read both:

  • approved shape artifact (source of truth)
  • .pulse/STATE.md (mirror)

Confirm and present:

  • mode
  • shape artifact and approval status
  • current work and practical goal
  • mirror status (in sync / out of sync / missing)

If shape approval is not APPROVED, stop. If shape artifact and mirror disagree, stop and return to planning for sync.

Use orientation template from references/runtime-appendix.md.

1) Reality gate (fail fast)

Run mode-fit and repo-fit checks before structural validation:

  • mode still matches task reality
  • approved shape matches real constraints
  • assumptions are explicit and testable
  • no smaller safe path is being overruled without reason
  • proof surface exists (files/APIs/commands/runtime checks)

If reality gate fails, route back to planning.

2) Feasibility matrix + spikes/probes

Build feasibility matrix for blocking assumptions:

  • always for high_risk_feature
  • for standard_feature whenever meaningful assumptions remain

Require spikes for unproven assumptions that can invalidate current work:

  • one spike bead = one yes/no spike_question
  • isolated execution with 30-minute timebox
  • findings at .spikes/<feature>/<spike-id>/FINDINGS.md
  • definitive YES or NO

If timebox expires without decision:

  • present findings
  • offer +15m extension only with explicit approval, replan, or mitigation
  • never continue silently

Decision handling:

  • YES: require planning-owned artifacts/beads to reflect constraints before execution approval (route to planning when those artifacts must change)
  • NO: stop, update planning artifacts, return to planning, then re-run validating

Bead-absence branch (feasibility-first path):

  • If feasibility is READY or READY WITH CONSTRAINTS and beads are required for current work but do not yet exist, stop and route to pulse:planning to create only validated current-work beads.
  • After bead creation, resume pulse:validating at Schema Gate, then continue structural checks and bead review before Gate 3 approval.

3) Schema gate (before structural checker)

Run schema gate only when current-work beads exist.

Before any structural checker:

  • verify every bead has canonical required fields
  • verify testing_mode: tdd-required beads include red/green tdd_steps
  • verify verify and verification_evidence are concrete
  • verify file scope is not obviously overbroad
  • verify HIGH-risk beads include meaningful learning_refs when prior recall clearly applies

If schema fails, repair bead schema defects when local/clear; route to planning when the fix requires reshaping planning-owned artifacts.

Use schema checklist in references/runtime-appendix.md.

4) Structural verification (max 3 iterations)

Run plan-checker only after feasibility + schema pass. PASS only if all dimensions pass:

  1. mode/shape coherence
  2. current-work coverage and ordering
  3. decision coverage
  4. dependency correctness
  5. file scope isolation
  6. context budget
  7. verification completeness
  8. integration/exit-state/risk coherence

Rules:

  • PASS only if all dimensions pass.
  • On fail, fix exact artifacts and re-run.
  • Maximum 3 iterations. If still failing after 3, escalate and stop.

5) Bead polishing and readiness

When beads are required, polish bead graph:

  • bv --robot-suggest for dependency completeness
  • bv --robot-insights for cycles/bottlenecks/orphans
  • bv --robot-priority for foundational ordering
  • deduplicate overlapping same-goal same-scope beads
  • run fresh-eyes bead review and resolve all CRITICAL flags
  • confirm current-work ↔ bead mapping coherence both directions

Then run readiness check:

  • entry state is concrete
  • exit state is observably provable
  • integration path is credible
  • verification is concrete
  • architecture boundaries are preserved
  • scopes remain surgical

Any “no/not sure” routes back to planning artifacts or bead set; do not approve.

6) Final approval gate (Gate 3 hard stop)

Present validation summary and request explicit approval. Use structured question tools when available; otherwise plain text.

Execution is forbidden until approval is explicit.

On approval:

  • update .pulse/STATE.md and .pulse/state.json to validated status
  • default approved path: record gate: GATE 3, gate_status: approved, next_action: manual_invoke, and set next_skill_recommended from recommended_mode, then stop
  • optional fast path: only continue in the same session when the user explicitly chooses an equivalent of Approve and continue now; in that case set next_action: continue_now before continuing
  • mode mapping for next_skill_recommended:
  • recommended_mode=swarm → pulse:swarming
  • recommended_mode=single-worker → pulse:executing

On rejection:

  • capture concern category and route back precisely (shape/current-work/approach/beads)

Use final approval template/options in references/runtime-appendix.md.

Execution Mode Compatibility

Validating must support both downstream modes:

  • Swarm mode: all validations complete, recommend pulse:swarming as next skill and default to next_action: manual_invoke
  • Single-worker mode: all validations complete, recommend pulse:executing as next skill and default to next_action: manual_invoke

Only switch to next_action: continue_now when the user explicitly asks to keep going in the same context. The validation standard is identical in both modes.

Lightweight Mode

Allowed only for confirmed LOW-risk direct/small single-slice work:

  • abbreviated reality + feasibility check
  • skip spikes
  • run bv --robot-suggest when beads exist
  • still require Gate 3 explicit approval

If uncertain, run full mode.

Context Budget

If context exceeds 65%, write a validating-owned handoff using the shared envelope and register it in .pulse/handoffs/manifest.json.

Red Flags

  • any execution before Gate 3 approval
  • skipping orientation on resume
  • validating while shape approval is not APPROVED
  • validating when shape artifact and .pulse/STATE.md disagree
  • running structural checker before reality/feasibility/schema pass
  • attempting a 4th structural iteration
  • missing or non-decisive HIGH-risk spike outcomes
  • continuing after a NO spike
  • unresolved CRITICAL bead-review flags at approval time
Compartilhar X LinkedIn